3 Volt Electric Logo

line

Install From Ground - Up

Initial Design

Layout of general wiring
  • Service Supply (SDG&E)
  • Service Entrance (Load Calcs)
  • Distribution (subpanels - field wiring)
  • Schematics (original layout, as builts)
  • System Maintenance (retrofit).

General Install
  • New Plug-in (add to existing)
  • Hot Tub (code required GFCI circuit)
  • Attic Fan
  • Dedicated Circuit Phone / Computer

Technical
  • Interface to Existing Equipment
  • PLC Controlled Equipment Operations
  • Electronic time clock w / override

line

*NEW HORSE TRADIN’ | HOME | CONTROL | REFERENCES | TROUBLESHOOT | WIRING

760-746-1093